Construction Progress, May 22, 2009

Jun 5th, 2009 | By lclark2 | Category: Facilities and Operations, Round Rock Campus

Chasco, the site utilities sub-contactor, has begun work on-site.  Trenches are being dug for domestic water lines and sanitary sewer lines across the site.  Ranger is wrapping up excavation and finish grading of the site water detention pond.  The outflow structure construction for the pond will commence soon. Building 1000 – The third floor level has [...] read more



Round Rock Campus Construction Progress, April 30, 2009

May 5th, 2009 | By admin | Category: Facilities and Operations, Round Rock Campus

The site development permit was approved by the City of Round Rock on April 30, 2009. A pre-construction conference with the city has been set up for Tuesday, May 05, 2009 at the Public Works Dept. After the conference is held, several new sub-contractors will move on-site to begin site improvement work, including the trenching [...] read more



Construction Progress, April 9, 2009

Apr 20th, 2009 | By admin | Category: Facilities and Operations, Round Rock Campus

The entire site has been cleared of brush, weed trees and debris.  The site is currently being rough graded to re-contour the site for the future parking lot and building locations.  About half the site has been proof-rolled.  This is the process by which heavy machinery compacts the topsoil to prepare a stable, dense sub-base [...] read more



ACC Round Rock Campus Public Forum

Feb 9th, 2009 | By admin | Category: Facilities and Operations, Round Rock Campus

February 16 | 6pm | Round Rock Public Library ACC hosts a public forum on Monday, February 16 at 6pm to share the latest information on the new Round Rock Campus. The forum will be held at the Round Rock Public Library located at 216 East Main Street. Hear an update on the campus and get [...] read more



Round Rock Campus Groundbreaking

Jan 12th, 2009 | By admin | Category: Round Rock Campus

Please mark your calendars! The Austin Community College District will host a groundbreaking ceremony for the new Round Rock Campus on Thursday, February 5 at 10:30 am. The event celebrates an exciting partnership for education and the most extensive building project in ACC’s history. Parking is available at the Round Rock Higher Education Center, 1555 University [...] read more



Plans For the New Round Rock Campus Presented

Sep 2nd, 2008 | By admin | Category: Round Rock Campus

Plans for the new Round Rock Campus were presented to the Austin Community College Board of Trustees during a regular meeting held September 2, 2008. The campus, located just south of University Boulevard, will accommodate 5,000 students in the first phase. Phase I of the project includes five buildings, with more than 250,000 square feet. “We [...] read more