Adaptive Reuse of Gymnasium Update
Wednesday, June 24th, 2009
Site work continues this week, mostly excavation and debris removal. Inside the shell, the elevator pit has been dug and the concrete floor and walls are poured.
Site work continues this week, mostly excavation and debris removal. Inside the shell, the elevator pit has been dug and the concrete floor and walls are poured.