Monday, May 18th, 2009
As the demolition continues, all asbestos-containing materials are removed from the roof and parapets. Very shortly, the entire building will be completely free of all asbestos and lead paint.

Adaptive Reuse of Gymnasium
This entry was posted
on Monday, May 18th, 2009 at 9:42 am and is filed under the Facilities and Operations category or categories.
You can follow any responses to this entry through the RSS 2.0 feed.
Please leave a response, or trackback from your own site.
Please leave a reply of your own using the form below